Co-Op, Bassett Green
Our Portfolio
Co-Op, Bassett Green
Southampton, UK
We delivered a full store refit of the Co-op at Bassett Green, transforming the existing retail space with a complete strip-out and installation of new flooring, refrigeration, services, and store fixtures. The works included structural alterations, plant installation, and reconfiguration of operational areas to support the updated store layout and operational requirements.
The 16-week construction programme involved extensive internal refurbishment works alongside external plant and roof upgrades, ensuring the store was fully modernised and aligned with the latest Co-op format.
Our scope included
Full strip-out of the sales floor and existing store fixtures
Removal of ACM materials from the basement by specialist contractor
Full removal of the existing shop floor structure
Installation of a new sales floor structure and finishes
Installation of new refrigeration cases throughout the store
Installation of new external plant equipment
Installation of a new external coldroom including formation of a new door opening
Demolition and relocation of the manager’s office
Reconfiguration of the bakery area
New freezer location and installation of ambient shelving
Installation of a new T-bar ceiling across the sales floor
Installation of new roller shutters
New vinyl flooring to the sales floor
Full mechanical and electrical fit-out across the store
Roof works to the main building structure
Key delivery points
Delivered a full supermarket refit within a 16-week programme
Managed specialist works including ACM removal and structural floor replacement
Installation of new refrigeration, plant, and M&E systems
Reconfigured store layout to improve operational efficiency
High-quality finishes delivered across customer and operational areas
Project timeline
Start on site: 11 August 2025 Construction completion: 26 November 2025 Handover: 27 November 2025