Lidl Sutton, High Street
Our Portfolio
Lidl Sutton, High Street
Sutton, UK
We delivered the internal fit-out of a new Lidl store in Sutton, transforming an existing shell unit into a fully operational supermarket. The project involved extensive internal works, specialist retail installations, and infrastructure upgrades to support Lidl’s operational requirements and store layout.
The 18.5-week construction programme included structural alterations, installation of specialist refrigeration and M&E systems, and full fit-out of both the trading area and back-of-house facilities, alongside external works including a new loading bay structure and goods lift installations.
Our scope included
Demolition and enabling works to prepare the unit for the Lidl store layout
Drainage alterations and adaptations to support the new store configuration
Installation of flooring throughout the store
Construction of internal walls and finishes across trading and operational areas
Installation of Lidl-required services throughout the building
Structural steel installations to bakery and goalpost areas
Suspended ceilings to bakery and back-of-house areas
Decorations throughout the store
Installation of refrigeration systems including roof-mounted plant and associated works
Installation of warehouse cold store and freezer units
Fit-out of back-of-house and domestic areas
Construction and fit-out of a new loading bay structure
Installation of new goods lifts and associated groundworks
Installation of new doors and suited locking systems
Installation of trolley protection internally and externally
Installation of new store signage
Installation of a new sprinkler system
Key delivery points
Delivered a full supermarket fit-out within an existing shell building
Coordinated structural, M&E, and specialist retail installations
Installation of large-scale refrigeration and cold storage systems
Integration of operational infrastructure including loading bays and goods lifts
High-quality finishes delivered across trading and operational areas
Project timeline
Start on site: 8 September 2025 Construction completion: 29 January 2026 Duration: 18.5 weeks