Uppercrust, Manchester Airport T2
Our Portfolio
Uppercrust, Manchester Airport T2
Manchester, UK
We delivered the internal fit-out of the Upper Crust unit within Manchester Airport Terminal 2, creating a fully operational food concession within the airside departures environment. The project involved construction of the customer-facing trading unit alongside a separate kitchen preparation area located within another section of the terminal.
The 61-day programme included structural installations, interior fit-out works, and coordination with multiple client-direct contractors responsible for specialist catering equipment, technology systems, and branded elements. Works were carefully managed within the highly controlled airport environment and in coordination with the main contractor.
Our scope included
Structural metal installation to support the store layout
Construction of internal partitions including fire-rated walls and fire doors
Installation of timber wall cladding and drylining systems
Wall tiling and flooring installations
Ceiling finishes and internal decorations
Joinery installations including casegoods and counters
Installation of refrigeration and catering support areas
Mechanical and electrical works including electrical, plumbing, air conditioning, fire detection, ventilation, and PAVA systems
Installation of internal and external signage
IT and data infrastructure
Installation of CCTV and security systems
Installation of seating, furniture, and FF&E
Final contract cleaning prior to handover
Key delivery points
Delivered a full food concession fit-out within a live airport environment
Coordinated multiple specialist contractors including catering, technology, and signage providers
Managed works across both trading and kitchen preparation areas
Maintained programme and quality standards within strict airport operational constraints
Project timeline
Start on site: 7 April 2025 Construction completion: 5 June 2025 Handover: 6 June 2025